Nowadays, the construction industry continues to develop, in many buildings we can find that steel structure as the main load-bearing structure, because steel structure is better than the traditional building structure in terms of shape and performance. However, in the process of Sichuan steel structure engineering construction, there are some possible quality problems, today I will briefly introduce them to you.

Cutting of raw materials

The steel structure is made in the factory to complete the component production, the first step of component production is lofting and cutting, to be carried out according to the processing drawings. If the processing quality of the components does not meet the requirements, the next process will be affected to a certain extent, which will also lead to a discount in the quality of the components, which will further affect the quality of the entire building. Therefore, the cutting of the steel structure must be carried out in strict accordance with the drawings.

Welding process

There

are three main ways to connect the steel structure, one is welding, the other is bolted connection, and another is rivet connection, but in the production process of components, it is mainly welding, and the quality of welding is related to the quality of the entire building, so it must be fully welded in terms of welding, and cannot miss welding.

On-site installation process

The biggest feature of steel structure building is

prefabricated, so installation is the most important step in the whole building, whether Sichuan steel structure project is stable and solid, depends on whether the installation process steps are correct. Once there is a problem with the quality of installation, it is not only easy to cause on-site construction accidents, but also make the quality of the entire project appear greatly discounted, so the quality of installation is particularly important in steel structure engineering.

Anti-corrosion and fireproof process

The fire performance and anti-corrosion performance of the steel structure are very poor, so we should pay attention to the coating of the fireproof coating of the component in the processing process of the component, as well as the coating of the anti-corrosion coating, through the protection of the coating, to

achieve the purpose of anti-corrosion and fire, the quality of the coating is usually the phenomenon of a large area of the paint film falling off, as well as the phenomenon of surface sagging, as well as the phenomenon of uneven thickness of the paint film, these points should be paid great attention to in the process of painting.

The above is the main points of Sichuan steel structure engineering construction sorted out by Xirong Steel Structure for everyone, I hope it will be of some help to you!

Keywords: Talking about the four major points of Sichuan steel structure engineering construction

Related Information

Company News

Industry News