Chengdu steel structure - rainy season steel structure construction measures

Time:2020-07-08

Summer is coming, the thunderstorm season is coming, our Sichuan steel structure engineering construction site is greatly affected by the rainy season,

not only the impact of the construction period, but more importantly, coinciding with the rainy season, how to manage our Sichuan steel structure construction site. Sichuan Xirong steel structure construction, through 17 years of steel structure construction, installation and management experience, for you to summarize the following rainy season Chengdu steel structure construction measures:

1. When constructing in rainy weather, it is advisable to set up a temporary protective shed, and rainwater must not fall on the hot weld. If the welding part is relatively wet, it must be wiped with a dry cloth and baked dry with an oxyyne flame before welding to keep the seam dry and no residual moisture.

2. When hoisting, if there is water on the component, it should be

cleaned before installation, but the coating should not be damaged, and when the high-strength bolt joint is installed, the friction surface of the component should be clean, there should be no water droplets, and it should not rain and contact dirt and oil and other dirt.

3. Rainy weather components cannot be painted.

4. In rainy days and strong winds above grade 5, roof insulation construction cannot be carried out.

5. Due to the relatively humid air in rainy days, the electrode should be stored moisture-proof and baked, and the same electrode should not be baked more than twice, and the management personnel should make baking records in time.

6. In case of windy weather, columns, main beams, supports and other large components should be corrected immediately, and permanent fixation should be carried out immediately after the position correction is correct to prevent unilateral instability. The steel structure engineering components installed on the same day should form a spatial stability system.

7. Due to the special conductivity of Sichuan steel structure, we must pay attention to the safety of construction personnel in thunderstorm weather, and pay attention to lightning protection and electricity protection.

The above is the construction measures and precautions of Sichuan steel structure engineering in the rainy season summarized by Sichuan Xirong steel structure construction. We hope to help you in your construction process. I also hope that you will communicate with us more if you encounter problems in the construction process of Chengdu steel structure, and everyone will make progress together!