Step 1 of steel structure engineering construction plan: steel structure foundation engineering

Time:2020-07-08

The foundation of the steel structure engineering is constructed by the civil engineering team, but when the steel bar binding of the foundation short column is completed, the formwork support is completed and the reinforcement is firm, the project department immediately sends professional technicians and construction personnel to carry out the steel structure bolt pre-embedding work. In order to ensure the installation quality of the superstructure, it is also necessary to work closely with the civil construction unit to check together. The position and extension length of anchor bolts, the levelness and elevation of the foundation support surface must be strictly controlled during embedding.

Key points of bolt embedded construction: In order to facilitate the bolt to be in place, the drilled steel mold prefabricated in the factory will be used to assist in positioning. When the foundation formwork is firmly supported, that is, the center line point (cross-shaped) is projected on the formwork surface, and according to the midline point, the position of the anchor bolt is initially positioned, and then the midline point on the formwork surface is adjusted to coincide with the crossline on the drilled steel mold, and the anchor bolt is accurately placed in the design position. After the anchor bolt is installed, check that the first wire buckle elevation at the lower end of the bolt meets the requirements, and the bolt is welded firmly on the steel mesh after qualifying. In order to prevent the anchor bolt from being damaged before or during installation, it is advisable to use a protective sleeve to protect the thread. In order to ensure the correct position and elevation of anchor bolts, a guard observation should be carried out when the concrete is poured in civil construction, and if changes are found, the construction personnel should be notified immediately to deal with them in time. When all foundation anchors are completed, report to the supervision company for the acceptance of the foundation project, and make a concealed project acceptance form, and submit it to the relevant units for confirmation. If unqualified parts are found, they will be repaired and rectified in time to ensure that all parts are fully qualified.

Keywords: Step 1 of steel structure engineering construction plan: steel structure foundation engineering

Related Information

Company News

Industry News